Pergola Building Regulations in New South Wales (NSW)

In New South Wales (NSW), whether you need a permit to build a pergola depends on several factors, including the size, height, and location of the structure. Here are the key points to consider:

When a Permit is Not Required

You generally do not need council approval for a pergola if it qualifies as an exempt development. The criteria for exempt development include:

  • Size: The pergola must have an area of 25 square meters or less.
  • Height: The height should not exceed 3 meters above ground level.
  • Floor Height: The floor height must be 1 meter or less above ground level.
  • Boundary Setback: The pergola must be located at least 900 mm from the lot boundary in most zones, and 5 meters in rural zones (RU1, RU2, RU3, RU4, RU6, or R5).
  • Materials: If metal components are used, they must be factory pre-colored and low reflective. In bushfire-prone areas, non-combustible materials are required.
  • Roof: The roof must not extend beyond the roof gutter line of the dwelling and must adhere to drainage system requirements.
  • Heritage Areas: In heritage conservation areas, the pergola must sit behind the building line of the road frontage.

When a Permit is Required

Council approval is necessary if the pergola does not meet the criteria for exempt development. This includes situations where:

  • The pergola exceeds 25 square meters in area or 3 meters in height.
  • It is placed closer than the required boundary setbacks.
  • It uses materials or colors that do not comply with regulations.
  • There is no adequate stormwater drainage system.
  • Vegetation or trees need to be removed.

Additional Considerations

  • Easements: If the pergola is to be built over an easement or stormwater drain, you will need to obtain consent from the local council.
  • Local Regulations: Always check with your local council for any additional requirements or specific regulations that may apply to your area.

Summary

  • No permit needed: For pergolas under 25 square meters, not more than 3 meters in height, and meeting all other exempt development criteria.
  • Permit needed: For larger structures, specific locations, or non-compliance with exempt development criteria.

Important Notice: Regulations and best practices may vary by location and are subject to change. We strongly recommend consulting with qualified professionals and local authorities for guidance specific to your situation.